As part of their rolling refurbishment program, Topps Tiles required their Norwich store upgraded out of hours.
As the existing concrete slab at Norwich was not suitable for diamond grinding and polishing, Ecoflor installed an 8mm pumped industrial screed over the prepared surface to create a smooth running floor.
Upon cure the newly installed industrial wearing surface was painted in a high build epoxy coating suitable for Topps busy daily store activities.
All of Ecoflor’s installation was carried out after trading hours allowing the store to remain open to the public throughout the refit.
Floor painting without disruption to your business.