When Ford Motor Company needed a contractor that could undertake extensive floor refurbishment works during manufacturing shutdown periods with the minimum of disruption to other engineering upgrades being completed, Ecoflor was the ideal choice.
Using their extensive HTC Grinding fleet, Ecoflor proceeded to remove large areas of existing floor finish to expose the underlying concrete floor slab. Our HTC Superprep diamond grinding process is vacuum controlled with all dust being bagged using the Longopac sealed dust container systems for disposal.
Once slabs had been thoroughly vacuumed, and an oil tolerant priming system applied, a 3mm epoxy resin flow system was installed. Upon cure, an anti-slip epoxy top coat was applied including all demarcation to create safe trucking routes for FLT’s with 5S demarcation for pedestrian walkways with safe crossing routes.
Ecoflor subsequently upgraded several further areas on shutdown following their successful hand back on time and on budget.